TY - GEN AB - Hydroelectric powerplants play a vital role in the electricity production mix, especially during the ongoing energy transition towards renewable sources. However, they face operational challenges due to harmful stress loading of various components. Ensuring safe operation remains essential for people's safety, electricity supply, and costs avoidance. The study focuses on penstocks and pipelines material damaging caused by fatigue, crack initiation and propagation. These critical components are often several decades old and expensive to refurbish or replace. Cycling loading, induced by pressure oscillations during start-stop or transient operations, accelerates material fatigue. Steel lining corrodes over time, and welds may contain original defects. To address this, a new testing facility that generates controlled cyclic pressure oscillations using the water hammer effect has been built. This specific closed-loop circuit allows accelerated fatigue testing of material probes, providing insights into crack initiation and propagation. The test rig operating principle is described while its 1D numerical model is introduced and validated with measurement data. The prediction of crack incipience and rupture of a tubular specimen with a pre-machined longitudinal weakening is in the end compared with the results of a fatigue test conducted on the test bench. AD - School of Engineering, HES-SO Valais-Wallis, HEI, HES-SO University of Applied Sciences and Arts Western Switzerland AD - School of Engineering, HES-SO Valais-Wallis, HEI, HES-SO University of Applied Sciences and Arts Western Switzerland AD - School of Engineering, HES-SO Valais-Wallis, HEI, HES-SO University of Applied Sciences and Arts Western Switzerland AD - School of Engineering, HES-SO Valais-Wallis, HEI, HES-SO University of Applied Sciences and Arts Western Switzerland AD - Power Vision Engineering Sàrl, St-Sulpice, Switzerland AD - School of Engineering, HES-SO Valais-Wallis, HEI, HES-SO University of Applied Sciences and Arts Western Switzerland AD - School of Engineering, HES-SO Valais-Wallis, HEI, HES-SO University of Applied Sciences and Arts Western Switzerland AU - Hasmatuchi, Vlad AU - Rittiner, Robin AU - Boyer-Pires, Salomé AU - Lecointre, Charly-Loup AU - Nicolet, Christophe AU - Münch-Alligné, Cécile AU - Rey-Mermet, Samuel CY - Bristol, UK DA - 2024-09 DO - 10.1088/1755-1315/1411/1/012039 DO - DOI EP - 012039 ID - 15338 JF - IOP Conference Series: Earth and Environmental Science ; Proceedings of the 32nd IAHR Symposium on Hydraulic Machinery and Systems, 11-14 September 2024, Roorkee, India L1 - https://arodes.hes-so.ch/record/15338/files/Hasmatuchi_2024_experimental_facility_dedicated_detection_prediction_penstock_fatigue_induced_pressure_oscillations.pdf L2 - https://arodes.hes-so.ch/record/15338/files/Hasmatuchi_2024_experimental_facility_dedicated_detection_prediction_penstock_fatigue_induced_pressure_oscillations.pdf L4 - https://arodes.hes-so.ch/record/15338/files/Hasmatuchi_2024_experimental_facility_dedicated_detection_prediction_penstock_fatigue_induced_pressure_oscillations.pdf LA - eng LK - https://arodes.hes-so.ch/record/15338/files/Hasmatuchi_2024_experimental_facility_dedicated_detection_prediction_penstock_fatigue_induced_pressure_oscillations.pdf N2 - Hydroelectric powerplants play a vital role in the electricity production mix, especially during the ongoing energy transition towards renewable sources. However, they face operational challenges due to harmful stress loading of various components. Ensuring safe operation remains essential for people's safety, electricity supply, and costs avoidance. The study focuses on penstocks and pipelines material damaging caused by fatigue, crack initiation and propagation. These critical components are often several decades old and expensive to refurbish or replace. Cycling loading, induced by pressure oscillations during start-stop or transient operations, accelerates material fatigue. Steel lining corrodes over time, and welds may contain original defects. To address this, a new testing facility that generates controlled cyclic pressure oscillations using the water hammer effect has been built. This specific closed-loop circuit allows accelerated fatigue testing of material probes, providing insights into crack initiation and propagation. The test rig operating principle is described while its 1D numerical model is introduced and validated with measurement data. The prediction of crack incipience and rupture of a tubular specimen with a pre-machined longitudinal weakening is in the end compared with the results of a fatigue test conducted on the test bench. PB - IOP Publishing PP - Bristol, UK PY - 2024-09 SN - 1755-1307 SP - 012039 T1 - Experimental facility dedicated to detection and prediction of penstock fatigue induced by pressure oscillations TI - Experimental facility dedicated to detection and prediction of penstock fatigue induced by pressure oscillations UR - https://arodes.hes-so.ch/record/15338/files/Hasmatuchi_2024_experimental_facility_dedicated_detection_prediction_penstock_fatigue_induced_pressure_oscillations.pdf VL - 2024, 1411 Y1 - 2024-09 ER -